НОВОСТИ И СОБЫТИЯ
28.11.2011
Fortum и ADD Grup подписали контракт на поставку и установку АСКУЭ на 25000 счетчиков.
подробнее
25.11.2011
Економическая эффективность решения ADDAX IMS послужила главным фактором при выборе системы в EVN
подробнее
06.10.2011
Компании T-MATIC и ARCUS – партнеры ADD Polska – установят смарт счетчики в Energa Operator.
подробнее
|
addax в Швеции
 |  | THOMAS KARLSSON Vallebygdens-Energi Technical Director ----------------------------- "ADDAX IMS: Easy-to-operate system with a lot of capabilities" | |  | Our regular commercial project, associated with ADDAX IMS implementation in the electrical energy distributing network Vallebygdens-Energi (Skara Kommun), successfully moves ahead in Sweden. In accordance with the Project the Metering system should provide remote collecting of energy consumption data from more than 2500 metering points, placed in several settlements. At the present moment two from three of planned segments are already put into operation. PROJECT PARAMETERS | Settlements: | Axvall, Varnhem, Bjurum | | Total number of meters: | more than 2500 | | Total number of 10/0.4 kV transformers: | more than 220 | | Number of 33/10 kV substations: | 3 | Project feature consists in wide-scale using of LV Power Line (0.4 kV) and MV Power Line (10 kV) for data exchange between the Center and meters, distributed over a large area. | | |  | On March, 2005 the System Acceptance Tests of the ADDAX IMS were performed at Vallebygdens-Energi (Axvall). The tests were carried out with complete success, and the System functionality and operability were confirmed entirely. | | Total number of installed ADDAX Meters in Swedish utilities: 280 103 units Including, meters within projects based on LV + MV PLC: 240 000 Units Some of our customers in Sweden: - Umea Energi
- Sundsvall Elnat
- Ljusdal Elnat
- BTEA
- Vallebygden Energi
- Herrljunga Elektriska
- Grastorp Energi
- Hjartum Energi
- Kvanum Energi
| |
|
Наша специализация
Полезные ссылки
|